|
PHASE II - CSU-P Graduate students
Mike DeMoss and Gocke Palak, under Professor Huseyin Sarper's
direction, have
completed the initial groundwork for monitoring the module output on
the web. via the Sunny
Portal
Concept -
Interactive Kiosk inside Technology Building
Photo and concept photoVickie Massam
Project
dedication - Photos April
26,
2007 April
25, 2007 -
Letter of Support from Pueblo
Board of County Commissioners
CSU-Pueblo
"Switching on to Renewables" at the dedication. Aquila made the switch
for the dedication ceremony.

Photo
- Vickie Massam
March 13, 2007


Photo Vickie Massam
23 second
clip of the modules by downloading or via Google
Video

CHIEFTAIN PHOTO/CHRIS McLEAN - March 17, 2007
September 2006 Surveying possible
sites, CSU-Pueblo
Engineering Building
Concept Photo - Twin Arrays outside Engineering and
Technology Building

Photo Vickie
Massam
Concept
photo - EcoStruct/EcoSol and
Sunsense
All rights reserved.
|